thapaliyamonika7 thapaliyamonika7
  • 11-07-2021
  • Mathematics
contestada

38)
A man completes a job in 5 days working 8 hours a day. How many days will he take to complete the same job working 2 hours overtime per day in addition?

​

Respuesta :

ddhgcbh
ddhgcbh ddhgcbh
  • 11-07-2021

Answer:

dbcjchdiskcnbcksksnnckdkxnn

Ver imagen ddhgcbh
Answer Link
thaliatelfort15 thaliatelfort15
  • 11-07-2021
Original measure work: 1 man x 5 days x 8 hours per day = Total Work Content = 40 hours.
Revised Work Schedule: = 40 Hours Work
Answer: 10 hours per day x 4 days x 1 man.
The Balancing Ratio on Time, an 20% uplift in daily labour input with 10 hours worked instead of 8 hours per day.
= 20% reduction in Total Length of Time from 5 days to 4 days)
Answer Link

Otras preguntas

Simplify. Assume all variables are non-zero. HELP PLEASE!!
slope 2, y-intercept at 0​
5/3x+5=1/3x-3 what does x represent
baste /bāst/ verb 1. to cover with liquid before or during cooking 2. to strike violently and repeatedly 3. to sew together loosely with large stitches 8 Select
What is this answer -50+200+(-800)
Xorlali neeas a number with an 8 in the ten thousands place. Which number can he choose? A. 8,021 C. 8,214,617 B. 16,816 D. 781,200
Solve 36+57 on the number line ?
An international business is defined as Multiple Choice one that implements homogenous practices across countries. the basis for a multinational enterprise. a b
In a submarine battle simulation, you know all the locations the enemy units can move to. Anticipating these moves, you call for reinforcements to be sent to th
Why does waverly call chess a game of secrets in which one must show and never tell? Why does she love secrets?