cricecrice6100 cricecrice6100
  • 12-02-2020
  • Social Studies
contestada

Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

what is an equation of the line that is perpendicular to -4/5x+3 and passes through the point(4, 12)
If a car can go from 0 to 60mi/hr in 8.0 seconds, what would be its final speed after 5.0 seconds if its starting speed were 50mi/hr? HELP PLEASEEE
each of the following types of figurative language is used in the excerpt except
What would this be ??
Breeding organisms because of beneficial traits
Why did Buddhism spread to other parts of Asia? Siddhartha Gautama sent out his followers to spread Buddhism. The Buddha traveled through the continent to car
Which inequalities are equivalent to r + 45 < 16?
Select the two TRUE statements: Libraries are the sole responsibility of the federal government. Making mass transportation available is one of the ways a loca
A word or phrase that modifies a word not included in the sentence is an
WORTH 16 POINTS NEED HELP ASAP Question 3 Choose the answer. Read the passages: from "How Old Man Winter Was Driven Back" "I, too, am powerful, and I am young!