ilovewritingffs ilovewritingffs
  • 12-12-2020
  • Mathematics
contestada

if 3 people can complete a job in 4 days, how many days will it take to complete the job with 5 people?

Respuesta :

briangetalla briangetalla
  • 12-12-2020
2.4 days because 3x4=12/5 =2.4
Answer Link

Otras preguntas

what are eight elements named after towns
Karen is 6 years older than Michelle and Michelle is 2 years younger then their brother. The sum of their ages is 62 how old is michelle
brilliant light displays that occur in the Ionosphere are called the?
what is same about all myriapods
what are the four requirements for life?
write a set of parametric equations for y=x^2+1 given the parameter t=x-2
I do not get how to do Simpliflyng Radicals.
what is the difference between mechanical waves and electromagnetic waves?
Can someone tell me the menstrual cycle :)
During the cell cycle, the complete period of non division is called what?