rabindrashrestha320 rabindrashrestha320
  • 13-02-2021
  • Mathematics
contestada

b) Kiran can do 1/8part of a work in 6 days. How much work does he do in
(i) 1 day
(ii) 4 days?​

Respuesta :

angstar4
angstar4 angstar4
  • 13-02-2021
1/8 per 6 days

x per 1 day
1/8 divided by 6/1
1/8 times 1/6
1/48 of the work in 1 day

1/48 times 4 days
4/48 or 1/12 of the work in 4 days
Answer Link

Otras preguntas

according to hamilton what are implied powers?A.powers not expressly forbidden in the constitutionB.powers that were forbidden in the constitutionC.powers that
6 divded by 2/3 = what
what is 7/5 as a decimal number
What is the historical significance of a republic
A grade has 81 girls and 72 boys. The grade is spilt into groups that have the same ratio of boys to girls as the whole grade. How many girls are in a group tha
3. The value of the expression 5.104 + 4.103 + 7.10 + 1 is equal to:
A grade has 81 girls and 72 boys. The grade is spilt into groups that have the same ratio of boys to girls as the whole grade. How many girls are in a group tha
what is 7/5 as a decimal number
What biome is New Caledonia considered?
A grade has 81 girls and 72 boys. The grade is spilt into groups that have the same ratio of boys to girls as the whole grade. How many girls are in a group tha