jacobnewcomb jacobnewcomb
  • 10-03-2021
  • Mathematics
contestada

A building company completes 42 homes every 2 months.

At this rate, how many homes can the company complete in 6 months?

Respuesta :

ace5713
ace5713 ace5713
  • 10-03-2021

126

Step-by-step explanation:

the ratio is 2months- 42 homes

6-126 = (2-42)x3

Answer Link
zerotwolover69 zerotwolover69
  • 12-05-2022

Answer:

the answer is a or b

Step-by-step explanation:

Answer Link

Otras preguntas

In pure water, a red blood cell from an animal will swell and burst, but a leaf cell from a plant will not. Which structure in the leaf cell is responsible
If I get +16/20 on a test what percentage is that?
The base of a lampshade is in the shape of a circle and has a diameter of 13 cm. What is the circumference, to the nearest tenth of an cm, of the base of th
Which religion in India combines the Muslim belief in one God with the Hindu belief in reincarnation?
The position of a place north or south of the equator is measured in ?
How does thermal energy heat a house? What devices and systems are involved?
Solve 2p^4+6p^3-8p^2-4p
If a Ferrari, with an initial velocity of 10 m/s, accelerates at a rate of 50 m/s2 , for 3 seconds, what was his ending velocity?
What number divided by 8 equals 7
What does ethical dimension mean