suareza36
suareza36 suareza36
  • 13-01-2015
  • Mathematics
contestada

a machine stamps 360 metal parts in 15 minutes. Find the unit rate in parts per hour

Respuesta :

thisisbenmanley
thisisbenmanley thisisbenmanley
  • 13-01-2015
Just divide the number of parts made by the number of hours to get parts per hour.  15 minutes is 1/4 of an hour, so we divide 360 by 0.25 hours:

[tex](\frac{360\ parts}{0.25\ hours}) = 1440\ parts\ per\ hour[/tex]
Answer Link
123jas321 123jas321
  • 13-01-2015
15 minutes is 1/4 of an hour which is .25 hours
so all you got to do is divided the total number of metal parts divided .25 hours
360/.25=1440 metal parts in one hour
Answer Link

Otras preguntas

Find the pattern and use it to list the nth term in the sequence. 1, 1/32,1/243,1/1024,1/3125
What does blood deliver to every part of the body
What it is the quadratic formula ?
what does 'in cold blood' mean?
what does 'butterfingers' mean?
How long will lucy have to wait before her $2500 invested at 6% earns $600 ?
write quadratic equation whose roots are 4 and -3 and whose leading coefficient is 5 use the letter X to represent the variable ? =0
a matchbox tray slides into its outer cover in how many different ways can you do this
let A={0,1,2,3,4,6} and B={2,4,6,8} find a.)AnB             b.)AUB
A certain type of water lily doubles the area it covers every year. Ten years after being planted in our lake the water lilies cover a quarter of the lake's sur