ambikathapa2010 ambikathapa2010
  • 12-02-2022
  • Mathematics
contestada

sanaya can do 1/3 part of a work in 1 day and chahanaa can do1/4 part of the same work in 1 day .How much work would they do working together​

Respuesta :

nyajahdonawa811 nyajahdonawa811
  • 12-02-2022

Answer: 36/5= 7.2 days to complete sanaya work day

Step-by-step explanation:

Answer Link

Otras preguntas

the sum of two consecutive multiples of 9 is 63. find these multiples Explain step by step for me please
phrasal verbs A-B, re-ordering Re-order these words to make correct sentences using phrasal verbs that all begin with the letters A and B. 1. the / the / TV /
American bison, which are large grazing mammals, are most often found clumped in small groups. What might you infer about the spatial distribution of American
Last years freshman class at big state university totaled $5330 students. Of those, $1258 received a merit scholarship to help offset tuition cost their freshma
Can someone help me with this plz
Given: Triangle ABC : triangle ADB. AB =24, AD =16 Find: AC
Laissez-faire economics and antitrust acts were
The surface area of a cube is 600 square inches what is the area of one of its faces
"A sports psychologist worked with a baseball player to improve his swing. Specifically, the psychologist was focused on the player keeping his shoulders straig
In a survey, adults and children were asked whether they prefer hamburgers or pizza. The survey data are shown in the relative frequency table. About 28% of chi