jesturban0001 jesturban0001
  • 13-09-2022
  • Mathematics
contestada

The road was 3.7 miles long. After a rebuild, it was 2.6 times as long. How long was the road after rebuilding?

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 14-09-2022

The road was 9.62 miles long after rebuilding.

How to calculate the length of the road ?

The road was initially 3.7 miles long

After a rebuild it was 2.6 miles as long

The new length can be calculated by multiplying the initial length which is  3.7 by 2.6

= 3.7 × 2.6

= 9.62

Hence, after the rebuild the road was  9.62 miles long

Read more on miles here

https://brainly.com/question/9243336?referrer=searchResults

#SPJ1

Answer Link

Otras preguntas

Is the sum of an irrational number and rational number always irrational?
Anita and maria went to the candy store. Maria bought 5 pieces of fudge and 3 pieces of bubble gum for a total of $5.70. Anita bought 2 pieces of fudge and 10 p
Staples has a calculator that is regularly priced $20 and is now on sale for 40% off. Brain has a coupon for 10% off anything in the store. What is the sale pri
When does a girl/boy stop growing?
EMERGENCY I NEED THE ANSWERS FAST Which is the adjective phrase in the sentence? Before dinner, bring the plates to the table, and wash that lettuce from the
can somebody help me???!!!!:/
t/2+t/3=5 solve for t
What is the role of enzymes in organisms?
There are 48 soccer teams in the springtown association. This is three less than three times the number of teams in the Lyon Association. How would you put this
Help on similar triangles #14