Razerblaze48 Razerblaze48
  • 11-01-2016
  • History
contestada

A potential cost for a government leader using a cost-benefit analysis is

Respuesta :

HistoryGuy HistoryGuy
  • 13-01-2016
A potential cost for a government leader using a cost-benefit analysis is that the leader will fail to consider all the variables that will contribute to the outcome of whatever he or she is planning, since it is often hard to anticipate all possible scenarios in such an analysis. 
Answer Link
gabby0926
gabby0926 gabby0926
  • 09-02-2021

Answer:

D: A lower chance of reelection.

Explanation:

I got it right on the test! Hope this helps! :)

Answer Link

Otras preguntas

All of the following determine a health worker's likelihood of contracting a blood borne disease from a patient EXCEPT the type of exposure the amount of blood
Pack-and-Move conducted a study that showed 98% customer satisfaction, with a standard deviation of 1%. The sample included 25 people who appeared in one of the
How many different outcomes are possible when 3 coins are flipped at once?​
Please look at the picture.
Why DNA is absent in blood plasma?
Simplify x - 1 / 5(x - 1)^2
What increased between the US & Europe?
Which graph correctly solves the system of equations below? y = x2 + 3x + 4 y = x2 + 2x + 1 (1 point) Select one: a. two quadratic graphs opening up. They inter
Ziehart Pharmaceuticals reported Net Sales of $195,000 and Cost of Goods Sold of $66,600. Candy Electronics Corporation reported Net Sales of $53,000 and Cost o
Round 34.4678 of to two decimals​